Articles
Hayle - Sub Categories
Hayle Harbour Redevelopment
ING Real Estate - developer behind Hayle Harbour redevelopment
140904 | PA14/07582 26/8/14 Shell Oil Products Ltd Demolition of existing sales building. Construction of new sales building
Via http://hayletowncouncil.net/documents/18september2014appa.docx.pdf
PA14/07582 26/8/14 Shell Oil Products Ltd Demolition of existing sales building. Construction of new sales building, bin store and car parking. Existing forecourt canopy cut - back. Shell Hayle, Carwin Rise, Loggans, Hayle 11/9/14 – extension req’d 26/8/14 Steve Diment No objection – submitted online 19/9/14
PA14/07583 26/8/14 Shell Oil Products Ltd Advertisement consent to display 5no. fascia signs Shell Hayle, Carwin Rise, Loggans, Hayle 11/9/14 – extension req’ d 26/8 /14 Steve Diment No objection – submitted online 19/9/14
140904 | Council meeting - Representatives from ASDA and Simon Humphrey from Bowmer & Kirkland were present
Via http://hayletowncouncil.net/documents/4Sept2014DraftMinutes.pdf
Representatives from ASDA and Simon Humphrey from Bowmer & Kirkland were present. read more »
140904 | 79 TO DISCUSS FEEDBACK REGARDING THE NEW ROAD LAYOUT AT LOGGANS MOOR ROUNDABOUT, INCLUDING THE BACKING UP OF TRAFFIC I
Via http://hayletowncouncil.net/documents/4Sept2014DraftMinutes.pdf
79 TO DISCUSS FEEDBACK REGARDING THE NEW ROAD LAYOUT AT LOGGANS MOOR ROUNDABOUT, INCLUDING THE BACKING UP OF TRAFFIC INTO ANGARRACK, AND WHAT, IF ANY, ACTION TO TAKE
There was a debate regarding the ease of use of the new road layout at Loggans Moor Roundabout and the problems of traffic back up and gridlock on Marsh Lane. Positive, neutral and negative opinions were expressed regarding the new road layout.
It was resolved that Councillor Capper’s comments regarding the back up of traffic on Marsh Lane and chaos at the Rugby Club on Sunday 27 July, which were emailed to EM Highways Services Ltd on 29 July 2014, be sent from Hayle Town Council to the Highways Agency
140829 | Breach repaired and sluice gates installed at Hayle Harbour | The Cornishman
Via http://www.cornishman.co.uk/Breach-repaired-sluice-gates-installed-Hayle...
Breach repaired and sluice gates installed at Hayle Harbour
Posted: August 29, 2014
|140828 | Scaffold currently on the new Asda at Hayle Cornwall
Via Twitter https://twitter.com/CSedgemanScaff/status/504987816020172800
Scaffold currently on the new Asda at Hayle Cornwall. Working for Online Brickwork. @NASCscaffolding pic.twitter.com/obWnNyxQIr
— Chris Sedgeman Scaff (@CSedgemanScaff) August 28, 2014
140826 | PA13/03357/PREAPP | Pre-application advice for residential development of 30-40 dwellings | Loggans Road, Hayle
PA13/03357/PREAPP | Pre-application advice for residential development of 30-40 dwellings on land identified by Cornwall Council as an urban extension to Hayle. Access to be provided off Loggans Road. | Land Off Loggans Road Loggans Road Hayle Cornwall TR27 4PL
http://planning.cornwall.gov.uk/online-applications/applicationDetails.d... read more »
Condition Number 27; Condition Number 28 Discharged on 18 August | PA14/06147 | Submission of details to discharge conditions 27
Please note this has been run through an OCR - for the original please refer to http://planning.cornwall.gov.uk:8181/rpp/showimage.asp?j=PA14/06147&index=12356692&DB=8&DT=4 read more »
140812 | Huge illuminated Asda sign at Hayle supermarket met with opposition - Cornishman
Via http://webcache.googleusercontent.com/search?q=cache:-2LY2fn5_HYJ:www.co...
Huge illuminated Asda sign at Hayle supermarket met with opposition
Posted: August 12, 2014
|140814 | PA14/07010 1/8/14 Submission of details to discharge condition 7 attached to decision notice PA12/06501 South Quay/Carn
Via http://hayletowncouncil.net/documents/14august2014appa.pdf
PA14/07010
1/8/14
Submission of details
to discharge
condition 7 attached
to decision notice
PA12/06501
South Quay/Carnsew
Quay, Hayle Harbour
North Quay Hayle
18/8/14
Andrew Golay
Details submitted for rebuilding the
breach in the quay wall as previously
discussed. Waiting for confirmation
from English Heritage.
No objection
–
submitted online
15/8/14
140814 | Necessity for and preferred location of a safe road crossing across Penpol Terrace at the end of the proposed bridge